Specification desk · Yunhe cluster · FOB Ningbo / Shanghaisales@wooden-play-kitchen.com · Request a quote
Wooden Play Kitchen

Buyer guides

Wooden play kitchen buyer guides

How to specify, pack and inspect a play kitchen order. Each guide is written for the buyer who has to sign off the sample, the carton and the container plan.

GUIDE 01

Reading play kitchen dimensions: height, worktop, footprint and age

How to measure a wooden play kitchen: overall height versus worktop height, footprint, depth, and the size band that fits each age group.

Read →

GUIDE 02

How to calculate play kitchen CBM and container fill

The CBM formula, a worked carton example, and how to turn carton cube into units per 20GP and 40HQ before you commit to a quantity.

Read →

GUIDE 03

Play kitchen safety: the failure modes a standards review tests for

Where a play kitchen actually fails a safety review: tip-over, hinge gaps, small parts and edges, plus the design controls that answer each one.

Read →

GUIDE 04

EN71, ASTM F963 and CPSIA: what a play kitchen buyer receives

What each standard covers, what document you should receive, how to read it, and which changes force a re-test before a play kitchen shipment.

Read →

GUIDE 05

Play kitchen assembly: flat-pack, semi-knocked-down and assembled

Flat-pack, semi-knocked-down or assembled: what each means for parts count, instruction quality, carton cube and the assembly issues you inherit.

Read →

GUIDE 06

Replacement parts and accessory planning for a play kitchen program

Which parts fail first, how to build a service-parts list, what spare ratio to order, and how accessory attach rates change container planning.

Read →

GUIDE 07

Mixed container loading: planning a multi-SKU play kitchen shipment

How to plan a multi-SKU play kitchen container: carton schedule, fill-rate target, weight check, loading sequence and the records to keep.

Read →

GUIDE 08

The play kitchen procurement checklist, from brief to container

A stage-by-stage procurement checklist for play kitchens, from range brief and sampling through inspection, loading and spare-parts handover.

Read →